CHUM Phase II

We are very happy to announce that Epsylon has just obtained the contract for the construction of the second phase of the University of Montreal hospital center (CHUM)!

We are given the mandate for the development of the envelope of buildings B2 to B4 for this second phase of the CHUM, which will be built on 17 floors and will feature more than 200 000 ft2 of curtain walls and architectural aluminum panels.

We are proud to collaborate with Pomerleau to the construction of this imposing hospital center, an anchor point of the new Health District in Montreal.

Research Centre of the Montreal University Hospital Centre

Epsylon was proud to have been selected for the construction of the external prefabricated curtain wall envelope of high thermal performance for the new Research Centre of the Montreal University Hospital Centre (CRCHUM). Epsylon was chosen for its expertise in the design and engineering of performing curtain walls that possess upscale features in terms of acoustics and thermal performances. The project consisted in the conception, construction, and maintenance of the new 69,000 sq. m. research centre.

The CRCHUM has obtained the LEED Gold certification.