CHUM Phase II

We are very happy to announce that Epsylon has just obtained the contract for the construction of the second phase of the University of Montreal hospital center (CHUM)!

We are given the mandate for the development of the envelope of buildings B2 to B4 for this second phase of the CHUM, which will be built on 17 floors and will feature more than 200 000 ft2 of curtain walls and architectural aluminum panels.

We are proud to collaborate with Pomerleau to the construction of this imposing hospital center, an anchor point of the new Health District in Montreal.

  • Status

    Ongoing
  • Line of business

    Institutional
  • Region

    Canada
  • Contractor

    Pomerleau
  • Owners

    Centre Hospitalier de l’Université de Montréal (CHUM) / Centre Hospitalier de l'Université de Montréal (CHUM)
  • Architects

    Jodoin Lamarre Pratte Architectes / MSDL Architectes

Share this project

FacebookTwitterLinkedIn